|
Resurs-O1 Program
Resurs-O1 is a Russian/CIS (Commonwealth of Independent States) satellite series. The
program was initiated by the USSR defense ministry in 1977 with the objective of observing
and monitoring natural Earth resources (similar in function and objectives to the Landsat
series of the USA). The very successful early Landsat program (with launches of LS-1 on
July 23, 1972, LS-2 on Jan. 22, 1975, LS-3 on March 5, 1978) prompted this reaction of the
Soviet Union. The Resurs-O1 program was initially managed by ROSHYDROMET
(State Committee for Hydrometeorology and Environmental Monitoring) of Moscow -
and later by NPO Planeta, an institution of ROSHYDROMET. NPO Planeta was also the
operator of the Resurs-O1 spacecraft series.
The first Resurs-O1 spacecraft started operations in 1985. The program was planned for a
long-term observation capability - to continue at least until 2000 (and beyond). Applications: observation of the state of agricultural crops, assessment of hydrological conditions,
forest and tundra fires, pollution monitoring etc. 1) 2)
|
Satellite
|
Launch Date
|
Orbit
|
Sensor complement or
payload
|
Remarks
|
|
Resurs-O1-1
|
Oct. 3,1985
|
Perigee= 574 km
Apogee= 663 km
Inclination= 98º
|
MSU-E (2), MSU-SK,
MSU-S
|
Analog sensor
output and digital
transmission
|
|
Resurs-O1-2
|
April 20, 1988
|
Perigee= 620 km
Apogee= 678 km
Inclination= 98º
|
MSU-E (2), MSU-SK,
|
Analog sensor
output and digital
transmission
|
|
Resurs-O1-3
|
Nov. 4, 1994
|
Perigee=660 km
Apogee=691 km
Inclination=98º
|
MSU-E (2), MSU-SK
(2), RRA,
|
Analog sensor
output and digital
transmission
|
|
Resurs-O1-4
(Cosmos 2360)
|
July 10, 1998
|
Sun-synchronous
Altitude=835 km
Inclination=98.7º
|
MSU-E1 (2), MSU-SK1
(2), MP-900B, RMK-2,
ISP-2, NINA, ScaRaB,
IRIS
|
Digital sensor output
and digital
transmission
|
Table 1: Overview of Resurs-O1 mission program
Spacecraft:
The Resurs-O1 spacecraft series employed the same bus as was being used by the Meteor-3 series of the former USSR - both platforms were designed and developed by
VNIIEM (All-Russian Scientific and Research Institute of Electromechanics), Moscow.
The bus is cylindrical with a diameter of 1.4 m. The spacecraft incorporates three-axis stabilization (0.5º accuracy, orientation accuracy of 6 arcmin along the velocity vector). A peak
power of 1.2 kW is provided by twin 10-m span solar panels. The S/C design life is 2 years
(with a goal of 3 years). The S/C launch mass is about 1800-1900 kg including a payload
mass of up to 600 kg. The orbit is adjusted/maintained by ion thrusters.
|
Total S/C mass. payload mass (average)
|
1900 kg, 500 kg
|
|
Earth pointing accuracy
|
6 arcmin
|
|
Power generation
|
500 W (average, 1200 W (peak)
|
|
Power supply (voltage range)
|
23-34 V
|
|
S/C design life
|
2 years
|
Table 2: Resurs-O1 series satellite characteristics
Figure 1: The Resurs-O1 spacecraft series (image credit: VNIIEM)
Orbit: sun-synchronous near-circular orbit, mean altitude = about 650 km, inclination =
98º, period = 97 minutes; local sun time between 10:00 to 10:30 hours on the ascending
node. Note: the Resurs-O1-4 (and planned follow-on) spacecraft have a higher orbit
than the Resurs-O1-1 to -O1-3 series. Resurs-O1-4: Sun-synchronous orbit, altitude
= 835 km, inclination = 98.7º, period = 101.2 minutes.
Launch: All Resurs-O1 series spacecraft were launched from the Baikonur Cosmodrome
on a Zenit-2 launch vehicle.
· RESURS-O1-4 was launched on July 10, 1998. Secondary payloads on the Zenit-2
vehicle were: TMSat (TMSat was renamed to Thai-Paht-1) of Thailand built at SSTL, the
Israeli TechSat/Gurwin-II, WESTPAC of Australia, SAFIR-2 of OHB-System, Bremen,
and the Chilean FASat-Bravo (built by SSTL, UK).
RF communications: X-band downlink at 8192 MHz, data rate of 7.68 Mbit/s. However, the
main downlink was in UHF at 466.5 MHz. The primary data collection and processing stations for Resurs-O1 series were at Moscow, Novosibirsk, and Khabarovsk.
|
Parameter
|
Resurs-O1-3
|
Resurs-O1-4
|
|
Carrier frequency
|
8.192 GHz and 466.5 MHz
|
8.192 GHz
|
|
Data rate
|
7.68 Mbit/s
|
15.36 or 61.44 Mbit/s
|
|
Modulation type
|
QPSK
|
BPSK (NRZ-M)
|
Table 3: Downlink characteristics of Resurs-O1-3/4 spacecraft
Operational status of the Resurs missions: 3)
· Resurs-O1-1 (launch Oct. 3, 1985) remained operational for 3 years until 1988
· Resurs-O1-2 (launch Apr. 20, 1988) remained operational for 7 years until 1995
· Resurs-O1-3 (launch 1994) remained operational for 6 years until the end of 2000
· Operations of RESURS-O1-4 continued until April 1999 when a communication failure disrupted the service. The spacecraft ended its operational service on Feb. 7, 2002. 4)
The Monitor-E mission (launch Aug. 26, 2005) is considered a continuation of the Resurs-O1-4 mission.
Sensor complement:
The Russian payloads were designed and developed by ISDE (Institute of Space Device Engineering, Moscow), also referred to as RNII KP.
MSU-E (High-Resolution Multispectral Scanner), a pushbroom CCD device for Resurs-O1-1 to O1-3). Three spectral ranges of 0.5 - 0.6 µm, 0.6 - 0.7 µm, 0.8 - 0.9 µm are
provided. Spatial resolution = 45 m x 33 m (IFOV = 7.11 arcsec x 5.9 arcsec); swath = 45 km
(for one device, FOV = 4º) , and 80 km for both devices (some overlapping), repeat cycle =
18 days. MSU-E has a look angle of ±32º (the instrument may be pointed in the cross-range
direction thereby extending potential coverage to a 600 km wide strip (±300 km to each side
of the S/C). The observation direction of the instrument can be set by ground commands in
steps of 2º. The scan rate of MSU-E is 200 lines/s. Instrument mass of 60 kg (2 units). 5)
MSU-E1 (Note: Resurs-O1-4 has a higher orbit than Resurs-O1-1 to -3). For Resurs-O1-4 and up, there are changes with regard to: a) look angle of ±30º; and b) swath
width = 60 km (for one instrument), the two MSU-E1 devices provide a total swath of 105
km. Otherwise same specification as for MSU-E.
MSU-S (Multispectral Scanner), a moderate resolution radiometer with 2 spectral bands
in the range 0.58 - 1.0 µm with a resolution of 240 m on a swath of 1380 km.
MSU-SK (Multispectral Scanner - Conical Scanning), a moderate resolution radiometer
with a look angle of 39º. This gives the sensor the advantage that although it is a wide-field
sensor, it produces constant resolution and viewing angle for all pixels, resulting in increased radiometric accuracy. Spectral bands (5): 0.5-0.6, 0.6-0.7, 0.7-0.8, 0.8-1.1, and 10.4 -
12.6 µm. Spatial resolution = 170 m (in VIS) and 600 m (TIR). Swath = 600 km, potential
repeat cycle = 3-5 days, orbit repeat cycle = 21 days. The scan rate is 50 lines/s in channels
1-4 and 12.5 lines/s in channel 5. The unusual scanner allows the MSU-SK instrument to
have an absolute radiometric error of just 1%, a Signal-to-Noise Ratio (SNR) of 80 dB and a
noise equivalent temperature of 0.5 K. The data quantization is at 8 bits. Instrument mass =
21kg. Downlink limitations: four out of five bands may be downlinked simultaneously.
MSU-SK1. Instrument for Resurs-O1-4 and up. Spatial resolution = 210 m (VIS) and 700
km (TIR). Otherwise same specification as for MSU-SK. An additional spectral band (3.5 -
4.1 µm) was used for Resurs-O1-4 only.
ISP-2 (Izmeritel Solnechnoy Postoyannoy-2 - a Solar Constant Instrument). The objective is
the measurement of the integral solar irradiation (solar constant) and of the shortwave reflected radiation of the Earth system. It is being used to complement the ScaRaB measurements. The ISP-2 radiometer consists of two channels with bolometer detectors:
· Solar constant channel: spectral band of 0.2 - 10.5 µm, FOV = 5º, accuracy of one measurement = 0.05%, accuracy of day-averaged measurements = 0.01%.
· Reflected radiation channel: spectral band of 0.3 - 3.0 µm, FOV = 60º, accuracy = 1%.
RMK-M (Radiation Measurement Control), of RMK-2 heritage flown on the Meteor-3 series satellites. Objectives: Registration of flux densities of protons in the 1-90 MeV and electrons in the 0.17-3.0 MeV energy regions. Measurement of galactic radiation with energies
above 600 MeV.
MP-900M TV Camera. The objective is the monitoring (imaging) of reflected radiation of
the Earth's surface and atmosphere (clouds) in the VIS and NIR spectral regions. The spatial resolution of the imagery is 1.6 km x 1.8 km.
RRA (RetroReflector Array), an array of two corner cubes in a linear array, carried on Resurs-O1-3. The satellite uses Fizeau style reflectors similar in design to those used on Meteor-2-21 [both reflectors have aluminum coating on the reflecting surfaces and near-diffraction-limited Far Field Diffraction Patterns (FFDP)]. - RKA requested the international community to track the RESURS-3 satellite. and to provide signal strength information along with ranging data.
Payloads of Non-Russian Institutions flown on Resurs-O1-4
NINA (New Instrument for Nuclear Analysis). NINA is a compact telescope, developed by
INFN (Italian National Institute of Nuclear Physics) of Rome, Italy and MEPhI (Moscow
Engineering and Physics Institute). The objective is to measure fluxes of charged particles,
in particular to detect cosmic ray nuclei of galactic, solar, or other origin from hydrogen to
iron, between 10 and 200 MeV/n. The silicon detector telescope is composed of 16 X-Y
planes, giving information on the energy of the crossing particle and its incident angle. Each
of the 32 sensitive elements consists of two n-type silicon detectors, 60 mm x 60 mm, divided
in 16 strips and connected to a supporting ceramic frame under lateral strips (1 and 16).
Each couple of detector is glued orthogonal in order to provide X and Y independent view
information. The thickness of the detector is 150±15 µm for the first plane, and 380±15 µm
for the remaining 15 planes. The geometric factor of the instrument ranges from 8.6 cm 2 sr
for low energy particles to 1 cm 2 sr for particles crossing the detector. The instrument mass
is 40 kg, power = 40 W. - NINA was flown on RESURS-O1-4 only. 6) 7)
Figure 2: Illustration of the NINA silicon detector (image credit: INFN)
ScaRaB (Scanner for Radiation Budget), of CNES [France (CNES, LMD), Russia (Planeta, RKA), Germany (GKSS) are program partners]. ScaRaB is a joint development of a
cross-track scanning radiometer. ScaRaB on Resurs-O1-4 is also referred to as ScaRab-2 since ScaRaB-1 was part of the Russian mission Meteor-3-7 from March 1994 to
March 1995. The objective of ScaRaB-2 is the collection of data on shortwave and longwave radiation (reflected solar and emitted thermal radiation) to estimate the Earth's radiation budget at the top of the atmosphere on global and regional scales. The instrument features four channels. Channels 2 and 3 are considered the main channels, while channels 1
and 4 are auxiliary channels. The optical subsystem features four parallel telescopes, one
telescope per channel, they are identical except for their filters. 8) 9) 10) 11) 12)
ScaRaB uses BARNES pyroelectric detectors for all bands (placed at the focus of a spherical aluminium mirror), which are sensitive only to the AC component of the signal (i.e. the
modulated energy). Hence, chopping is needed for each pixel. This reduces the influence of
the self radiation of the telescope and filters. Two mechanical choppers are used (one for
two channels), providing a 10 Hz chopping frequency. The four channels, the two choppers,
and a filter wheel dedicated to channel 2 and 3, are mounted on a scanning optical bench
(rotor). The telescopes are swiveled by the optical bench so that no extra mirror for the
scanning is needed. This reduces the likelihood of offsets dependent on the scanning angle.
|
Nr.
|
Spectral band
(channel)
|
Band description
|
Filter
|
|
1
|
0.5 - 0.7 µm
|
Visible channel: scene identification
|
Interference
|
|
2
|
0.2 - 4 µm
|
Solar channel: derivation of Earth radiation budget parameters
|
Fused silica
|
|
3
|
0.2 - 50 µm
|
Total radiation channel
|
None
|
|
4
|
10.5 - 12.5 µm
|
Atmospheric channel scene identification (window channel)
|
Interference
|
Table 4: Spectral bands of ScaRaB
The spatial resolution of ScaRaB data is 48 x 48 mrad, scan angle=100º, swath width = 3200
km. ScaRaB points to nadir and scans the full field of view (FOV) within six seconds. In this
cross-track mode data are generated continuously.
Figure 3: Illustration of the ScaRaB instrument (image credit: LMD)
|
Parameter
|
Value
|
Parameter
|
Value
|
|
IFOV
(spatial resolution)
|
48 mrad x 48 mrad
(60 km x 60 km at nadir)
|
Sampling interval
Sampling period
|
34 mrad
62.5 ms
|
|
FOV (swath)
|
100º (3200 km)
|
Scan period
|
6 s
|
|
Pixels per scan
|
51
|
Useful scan time
|
3.18 s
|
|
Dynamic range (solar)
|
up to 425 W m-2 sr-1
|
Instrument mass, power
|
40 kg, 42 W (average)
|
|
Dynamic range (total)
|
up to 500 W m-2 sr-1
|
Instrument size (mm)
|
614 x 512 x 320
|
Table 5: ScaRaB instrument parameters
Calibration subsystem: Gray lamps and blackbodies are used for on-board gain calibration;
deep space is used for offset calibration. That subsystem comprises a set of two reference
blackbodies for channels 3 and 4, and a set of gray calibration lamps for channels 1, 2 and 3.
There is continuous thermal control of the blackbodies. The gray lamps are turned on during the calibration session (typically once per day). In addition, there are short wave references, consisting of two lamps for the calibration of channels 2 and 3 (typical use is once per
month). On the ScaRaB/Meteor-3-7 mission, however, the lamp system was damaged so
that actual calibration was performed by using the instrument temperature and a pre-
launch established gain-temperature law. The remaining lamps were then used to verify this
calibration. During one year of operation, no significant sensor degradation was observed.
ScaRaB has a duty cycle of 100%, data rate=3 kbit/s, data volume=18 Mbit/orbit. An instrument mass memory provides data storage for up to 12 hours. The mass of the instrument
is 40 kg, the maximum power use is 70 W. - The ScaRab instrument was only flown on Resurs-O1-4.
LLMS (Little LEO Messenging System), an ESA communications payload also referred to
as IRIS (Intercontinental Retrieval of Information via Satellite). The objective is to provide
a low-cost, worldwide electronic mail (e-mail) commercial service (collection and distribution of e-mail messages). The payload consists of four redundant and interconnected
units: OBC (On-Board Computer), TT&C, the RF unit and the SS (Spread Spectrum) unit
with CDMA modem and UHF transceiver. In the overall configuration, messaging is
uploaded during contact periods from the HUB (or gateway) station in the ground segment
via satellite to its destination and vice versa (remote subscriber terminal at the one end and
fixed user at the other end). Each HUB station pass enables the exchange of all data collected by the satellite (and by the HUB station) since the last contact by store-and-forward
techniques. The HUB station, located at the high-latitude site of Svalbard (78º N), Spitzbergen, Norway, for reasons of frequent satellite contact times (visibility of each S/C orbit),
is connected via public network to the user community. A dedicated TT&C station provides
in addition operations control of the payload(s). The message storage and retrieval functions of OBC are handled by an adaption of a transputer-based architecture already flown
on BREMSAT-1 and on SAFIR-1/2 satellites. The total mass of the attached LLMS/IRIS
payload is 67 kg, its power consumption is 72 W, of which 44 W is for the communication
payload (RF+SS). 13) 14) 15) 16) 17)
Background: The LLMS/IRIS program, an initiative of Belgium's space industry, is mainly
financed by the Federal Office for Scientific, Technical and Cultural Affairs (OSTC) of Belgium, with a contribution from its German counterpart (DLR). The development of this
advanced telecommunication platform (a turnkey demonstrator system) has been carried
out within the context of an ESA development initiative, under SAIT-Systems S. A. of Brussels as the prime contractor. Other industrial participants in the program are: OHB-System
of Bremen, Germany, Alcatel Bell of Belgium, the SEMA Group SAE of Spain, and Warberry Communications, UK. LLMS/IRIS is the first Little-LEO communications system using spread-spectrum modulation in the service links to and from the S/C as well as on-board
demodulation techniques. SAIT Systems has also a contract from ESA to operate LLMS/IRIS for a period of three years. 18)
Communication concept: LLMS/IRIS is employing a data transmission scheme referred to
as SSMA (Spread Spectrum Multiple Access) in the UHF frequency band (uplink at 388
MHz, downlink at 400.6 MHz), permitting shared operations for customer services from
remote user terminals. SSMA is used in both directions (uplink and downlink) offering such
advantages as: a) interference-tolerant transmission, b) use of anti-jamming features, c) the
random access scheme provides very good channel discrimination for multiple access, and
d) it permits the measurement of propagation time between payload and user terminal (in
combination with the Doppler estimation this measurement enables the system to localize
the user terminal). The chip-based timing resolution of the spread-spectrum downlink is 0.2
µs. Localization accuracies projected: a)<3 km for coarse and b) <1 km for fine localization.
The communication payload can be put into one of two different communication modes:
· Service link: The service link is used for communication between the user terminal and
the payload (or vice versa).
· Feeder link. The feeder link serves as high-rate communication link between the payload and the HUB station.
|
Parameter
|
Service downlink
|
Service uplink
|
Feeder downlink
|
Feeder Uplink
|
|
F-chip (MHz)
|
0.538
|
1.077
|
0.538
|
1.077
|
|
L (chips)
|
128
|
512
|
32
|
64
|
|
Efficiency (bit/symbol)
|
2
|
1
|
6
|
6
|
|
Byte/slot
|
134
|
134
|
345
|
345
|
|
Symbol rate (s/s)
|
4207
|
2103
|
16,827
|
16,827
|
|
Brute bit rate (bit/s)
|
8,414
|
2103
|
100,962
|
100,962
|
|
Net bit rate (bit/s)
|
4,709
|
1,177
|
71,112
|
71,112
|
|
Slot duration (ms)
|
127.4
|
509.7
|
27.3
|
27.3
|
|
Modulation scheme
|
O-QPN
|
B-PN
|
O-QPN
|
B-PN
|
Table 6: Modulation parameters employed on the different link modes
A user terminal (fixed or mobile) design resorts to custom (ASIC) integration to process the
spread-spectrum signals used by LLMS/IRIS. Typical terminal characteristics are:
· Standard RS-232 interfaces (one RS-232 opto isolated)
· Antenna: 1/4 wave groundplane or drooped-dipole
· Batteries: 6 x UM-3; standby: autonomy for 100 hrs, and continuous receive for 5 hrs
· Transmit power of <3 W
· Terminal size: 200 mm x 150 mm x 50 mm; mass < 1 kg.
Extension of Resurs Program
Originally, the Resurs-O1 series was scheduled to be replaced by the Resurs-O series, an
evolutionary series with an increased payload in the time frame 2000 and beyond. However,
the program was stalled at the start of the 21st century due to the tight economic situation in
Russia.
A major payload addition to this Resurs-O series was to be a radar instrument, RLSBO
(Side Looking Real Aperture Radar) in L-band as shown in Figure 4. 19)
Figure 4: Illustration of the Resurs-O spacecraft (image credit: VNIIEM)
1) T.M. Wasjuchina, A.M. Wolkow, "Zustand und Perspektiven der Entwicklung Kosmischer Systeme zur Erforschung
natürlicher Ressourcen der Erde und der Hydrometeorologie," Moscow 1988, translated into German by R. Müller,
1989 (IKF)
2) COSPAR-90-Paper by A. Karpov, USSR State Committee for Hydrometeorology, Moscow. Title of paper:
"Hydrometeorological, Oceanographic and Earth-Resources Satellite Systems operated by the USSR."
3) http://sputnik.infospace.ru/resurs/engl/resurs.htm
4) Information provided by Igor V. Cherny, Space Observation Center, Roskosmos, Moscow
5) Information provided by B. Kutuza of IRE, Moscow, and translated by B. Zhukov of DLR, Oberpfaffenhofen
6) R. Sparvoli, et al., "Launch in orbit of the telescope NINA for cosmic ray observations: preliminary results,"
Proceedings of The Sixth Topical Seminar on `Neutrino and Astro-Particle Physics,' Centro Studi `I Cappuccini' in
San Miniato al Todesco, Italy, May 17-21, 1999
7) http://wizard.roma2.infn.it/nina/html/nina_home.htm#
8) http://scarab.cnes.fr:8020/
9) http://www.lmd.polytechnique.fr/~Scarab/english/Orbs.htm
10) J.-Ph. Duvel, M. Viollier, P. Raberanto, R. Kandel, M. Haeffelin, L. A. Pakhomov, V. A. Golovko, J. Mueller, R.
Stuhlmann, "The ScaRaB-Resurs Earth Radiation Budget Dataset and First Results," BAMS (Bulletin of the
American Meteorological Society), Vol. 82, No 7, July 2001, pp. 1397-1408
11) J. L. Monge, R. Kandel, L. A. Pakhomov, B. Bauche, "ScaRaB Earth radiation budget scanning radiometer," SPIE,
Vol. 1490 , `Future European and Japanese Remote Sensing Programs,' 1991
12) J. Mueller, et al., "Ground Characterization of the Scanner for Radiation Budget (ScaRaB) Flight Model 1," Journal
of Atmospheric and Oceanic Technology, Vol. 14, No 4, pp.802-813, 1997.
13) V. Larock, A. Jongejans, "IRIS, First Operations," presented at the Conference on "Small Satellites Systems and
Services," Sept. 14-18, 1998, Antibe-Juan les Pins, France
14) C. van Himbeek, I. Deman, B. Clarenne, "The LLMS DS/SS (Direct Sequence/Spread Spectrum) Payload,"
accepted for ISSSA (International Symposium on Spread-Spectrum Techniques & Applications), Darmstadt 1996
15) V. Larock, A. Ginati, "IRIS: Going Commercial with High-Tech European LEO Microsatellites," Proceedings of the
IAF '94
16) "First European Payload for Worldwide E-Mail Service Launched," ESA Bulletin 95, Aug. 1998, p. 179
17) http://www.esa.int/esaCP/Pr_25_1998_p_EN.html
18) P. B. de Selding, "Belgium Firm Seeks Investors for IRIS E-Mail Venture," Space News, Sept. 28 - Oct. 4, '98, p. 22
19) Yu. V. Trifonov, "The Russian Space Earth Observation System 'Resurs-O'", Space Bulletin, Vol. 1, No. 2, 1998,
pp. 11-13
This description was provided by Herbert J. Kramer from his documentation of:
"Observation of the Earth and Its Environment: Survey of Missions and Sensors" -
comments and corrections to this article are welcomed by the author.
|
Resources of same Organisation 
ROSHYDROMET
Service (3)
Resources of same Type 
Service>Satellite mission>Earth observation
|